Sign In | Join Free | My brakesband.com |
|
Brand Name : PIONEERTEX
Model Number : CMC5,CMC8,CMC13
Certification : ISO9001 & ISO14001
Place of Origin : Jiangsu, China
MOQ : 1000 Square Meter/Square
Price : $14.00 - $18.00 / Square Meter
Supply Ability : 2000 Square Meter/Square Meters per Week
Packaging Details : One layer of waterproof PE film inside, and one lay of PE Film outside.
Warranty : 5 years
After-sale Service : Online Technical Support
Project Solution Capability : graphic design
Product name : geosyntheic cementious composite mat GCCM
Color : Green
Powder Material : concrete powder
geotextile : Polyester geocomposite
Backing : PE Film or Aluminum foil composite
Brand : PIONEERTEX
Key word : CONCRETE MAT CLOTH
Certificate : SGS
Thickness : 8MM
TENSILE STRENGTH : 50kn/m
Port : NANJING or Lianyungang Port
Concrete mat cloth GCCM-8mm permanent erosion control for slope protection
Concrete Mat Cloth GCCM User Benefits
Rapid Install
CMC can be laid at a rate of 150m2/hours, up to 10 times faster than conventional concrete solutions.
Lower Project Cost
The speed and ease of installation means that CMC GCCM is more cost-effective than conventional concrete with less logistical complexity.
Eco-Friendly
CMC is a low mass, low carbon technology which uses up to 95% less material than conventional concrete for many applications. CMC is made from high strength geotextile and a special cement mixture. Its life expectancy can reach up to 30 years. What's more, it needs no maintenance.
Specification
Concrete Mat Cloth GCCM Physcial Properties | |||||
CMC | Thickness (mm) | Mass(unset) (kg/m2) | Density(unset) (kg/m3) | Density(set) (Kg/m3) | Roll Width (m) |
CMC5 | 5 | 8 | 1500 | 20% | 2.1 |
CMC8 | 8 | 11 | 1500 | 20% | 2.1 |
CMC13 | 13 | 18 | 1500 | 20% | 2.1 |
. | |||||
Pre-set CC Properties | |||||
Setting | |||||
Working time: 1-2 hours subject to ambient temperature. | |||||
CC will achieve 70-80% strength at 24 hours after hydration. | |||||
Method of hydration | |||||
Spray the fiber surface with water until it it feels wet to touch for several minutes | |||||
after spraying. | |||||
Re-spray the CC again after 1 hour if: | |||||
1.installing CC in a steep or vertical surface; | |||||
2.Installing in warm climates; | |||||
Notes: | |||||
1. CMC can not be over hydrated and an excess of water is always recommended; | |||||
2. Minimum ratio of water:CMC by weight: 1:4 | |||||
3. Don't jet high pressure water directly onto the CMC as this may wash a channel in CMC. | |||||
4. Please use non-saline water for hydration.If CMC will be used for sea projects,please | |||||
advise us beforehand. | |||||
5. CMC can hydrate and set under water; | |||||
6. CMC has a working time of 1-6hours after hydration. Don't move or touch CMC | |||||
once it has begun to set. | |||||
7. Working time will be reduced in hot climate; | |||||
8. CMC will set hard in 2-3 hours,but will continue to gain strength for several months. | |||||
Set CC Properties | |||||
Strength: PioneerTex Concrete Mat Cloth has very high early strength | |||||
Item | Test Method | MARV | |||
Compressive Strength | ASTMC109-02 | 35-40 Mpa | |||
Bending Strength | BS EN12467:2004 | 3-6 Mpa | |||
CBR Puncture Strength | EN ISO12236:2007 | 3.5KN | |||
Tensile Strength(KN/M) | |||||
Length Direction | Width Diection | ||||
CMC5 | 25 | 20 | |||
CMC8 | 28 | 24 | |||
CMC13 | 32 | 28 | |||
Other | |||||
Item | Test Method | Value | |||
Freeze-thaw resistance | BS EN12467:2004 Part5.5.2 | pass | |||
Soak Dry | BS EN12467:2004 Part5.5.5 | pass | |||
Water Impermeability | BS EN12467:2004 Part5.4.4 | pass | |||
Fire Retardant | 16 CFR PART 1633 | pass |
Who are we?
PioneerTEX is the professional and leading manufacturer of Concrete Mat Cloth rolls in China.
We have the patent for Concrete Mat Cloth in China.
We developed Concrete Mat Cloth Since 2014, and we get the patent in 2017.
And the technolog for Concrete Mat Cloth is mature in 2016.
What is Concrete Mat Cloth (CMC) GCCM ?
CMC GCCM is a flexible and soft cement impregnated fabric, that hardens on hydration to form a thin,durable,water proof and fire retardant concrete layer. Essentially, it's concrete on a roll.
What's the structure of Concrete Mat Cloth GCCM?
CMC GCCM was made of woven geotextile, nonwoven geotextile, HDPE geomembrane, and 3D structure geocomposite fabric.
The specially formulated dry concrete powder mix will be reinforced by 3D mesh geo-fabric, and sandwiched between porous nonwoven geotextile and water proof HDPE geomembrane or Aluminium Foil composite.
How does the Concrete Mat Cloth CMC GCCM work?
CMC GCCM allows concrete construction without the need for plant or mixing equipment. It's very easy, and just add water on the CMC non-waterproof side.
Once Set, the 3D mesh fabric will reinforce the concrete, prevent crack propagation and provide a safe plastic failure mode. The woven and nonwoven geotextile on the top side will offer special protection on the CMC, and offer higher tensile strength for composite.
HDPE geomembrane backing on the bottom surface of CMC ensures the material is completely water proof.
How many types of Concrete Mat Cloth GCCM are we manufacturing?
CMC GCCM is available in 3 thickness:
CMC5,
CMC8
CMC13.
They are 5,8 and 13mm thick respectively.
The CMC will become hard after hydration as below:
The Concrete Mat Cloth rolls before hydration is as below:
Application:
Ditch line
Slope Protection
Tunnel lining
Pond liner
Water reservior
Flexible Concrete Mat Cloth in Green color for ditch lining with thickness 5mm-13mm Images |